BUILDING (GENERAL) REGULATION 2008 - REG 18

Requirements for plans for asbestos removal—Act, s 27 (1) (a)

    (1)     Plans that accompany an application for building approval for building work involving the removal of bonded asbestos must show the location of the bonded asbestos sheeting.

    (2)     Plans that accompany an application for building approval for building work involving the removal of asbestos (other than bonded asbestos) from a residential building must include the following information:

        (a)     the location of the asbestos proposed to be removed;

        (b)     the boundary of the area where people removing the asbestos will be working;

        (c)     if asbestos removed from the building is to be stored on the parcel of land where the building is—where the asbestos is to be stored;

        (d)     if a decontamination facility, air filter or air supply equipment, is proposed to be used during the building work—where the facility, filter or equipment is located.