(1) An issuing body may vary a tonnage certificate under this section if the issuing body is satisfied that the criteria prescribed by the regulations in relation to the variation of the certificate are met .
(2) Without limiting subsection ( 1), an issuing body may vary a tonnage certificate to impose, vary or remove a condition on the certificate.