Commonwealth Consolidated Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

RADIOCOMMUNICATIONS ACT 1992 - SECT 118QD

Access to broadcasting transmission towers

  (1)   The owner or operator of a broadcasting transmission tower must, if requested to do so by a person (the access seeker ) who is:

  (a)   a digital radio multiplex transmitter licensee; or

  (b)   a person authorised by a digital radio multiplex transmitter licensee under section   114;

give the access seeker access to the tower.

  (2)   The owner or operator of the broadcasting transmission tower is not required to comply with subsection   (1) unless:

  (a)   the access is provided for the sole purpose of enabling the access seeker to install or maintain either or both of the following:

  (i)   a multiplex transmitter;

  (ii)   associated facilities;

    used, or for use, wholly or principally in connection with the transmission of one or more designated content services in accordance with the digital radio multiplex transmitter licence concerned; and

  (b)   the access seeker gives the owner or operator reasonable notice that the access seeker requires the access.

Compliance not technically feasible

  (3)   The owner or operator of a broadcasting transmission tower is not required to comply with subsection   (1) if there is in force a written certificate issued by the ACMA stating that, in the ACMA's opinion, compliance with subsection   (1) in relation to that tower is not technically feasible.

  (4)   In determining whether compliance with subsection   (1) in relation to a tower is technically feasible, the ACMA must have regard to:

  (a)   whether compliance is likely to result in significant difficulties of a technical or engineering nature; and

  (b)   whether compliance is likely to result in a significant threat to the health or safety of persons who operate, or work on, the tower; and

  (c)   if compliance is likely to have a result referred to in paragraph   (a) or (b)--whether there are practicable means of avoiding such a result, including (but not limited to):

  (i)   changing the configuration or operating parameters of a facility situated on the tower; and

  (ii)   making alterations to the tower; and

  (d)   such other matters (if any) as the ACMA considers relevant.

Issue of certificate

  (5)   If the ACMA receives a request to make a decision about the issue of a certificate under subsection   (3), the ACMA must use its best endeavours to make that decision within 10 business days after the request was made.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback