Building lot
(1) For the purposes of this Part, a fibre - ready facility used, or for use, in connection with a line is installed in proximity to a building lot if, and only if, it is installed:
(a) in, on or under the lot, so as to enable the line to be readily connected to a building unit that has been, is being, is to be, or may be, constructed on the lot; or
(b) in sufficient proximity to the lot as to enable the line to be readily connected to a building unit that has been, is being, is to be, or may be, constructed on the lot.
Building unit
(2) For the purposes of this Part, a fibre - ready facility used, or for use, in connection with a line is installed in proximity to a building unit if, and only if, it is installed in sufficient proximity to the building unit as to enable the line to be readily connected to the building unit.