(1) The Chief Metrologist must send a copy of a determination made under subregulation 17(2), 18(4) or 19(2) to each verifying authority appointed to verify standards of measurement to which the determination relates.
(3) A determination applies to a verifying authority when the authority is given a copy of the determination under subregulation (1).