(1) A petroleum titleholder commits an offence if the titleholder:
(a) drills a well or conducts another operation on a well in a title area; and
(b) collects a kind of core, cutting or sample mentioned in an item in the table in subregulation (4); and
(c) does not give the core, cutting or sample to the Titles Administrator within:
(i) the time specified for that item; or
(ii) if the Titles Administrator authorises the titleholder to give the core, cutting or sample in another period--the other period.
Note: Division 2 sets out requirements for the collection and keeping of cores, cuttings and samples.
(2) The titleholder must give the Titles Administrator the quantity of the core, cutting or sample specified for that item if that quantity is available.
(3) If the specified quantity is not available, the titleholder must:
(a) give the Titles Administrator an explanation why the specified quantity was not sent; and
(b) tell the Titles Administrator the total amount of the core, cutting or sample that was recovered.
(4) Kinds of core, cutting or sample mentioned in paragraph (1)(b) are set out in the following table.
Item | Sample type | Quantity of core, cutting or sample | Time by which core, cutting or sample must be given |
1 | Ditch cuttings | 2 sets of 200 grams dry weight per sample interval | The day 6 months after the rig release date |
2 | Full hole conventional cores | 1/3 of the core | The day 6 months after the rig release date |
3 | Full hole conventional cores | 2/3 of the core | As soon as practicable after the titleholder completes tests on the core |
4 | Gaseous hydrocarbon samples | 300 cm 3 | As soon as practicable after completion of the test during which the sample is collected |
5 | Fluid hydrocarbon samples | 1 litre | Either: (a) if the sample is collected during the drilling of a well--the day 6 months after the rig release date; or (b) if the sample is collected during a test on a completed well--as soon as practicable after collection of the sample |
6 | Sidewall core material | All material collected | The day 18 months after the rig release date |
7 | Palynological slides and residues, Paleontological material and Petrological slides | All material collected | The day 18 months after the rig release date |