Commonwealth Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Download] [Help]

NATIONAL GREENHOUSE AND ENERGY REPORTING AMENDMENT (2014 MEASURES NO. 1) REGULATION 2014 (SLI NO 131 OF 2014) - SCHEDULE 1A

Things that are not natural gas supply pipelines

Note:       See paragraph (a) of the definition of natural gas supply pipeline in regulation 1.03.

   

   

1   Definitions

                   In this Schedule:

"relevant Northern Territory Department" means the Department of State of the Northern Territory that deals with energy supply.

"relevant Queensland Department" means the Department of State of Queensland that deals with energy supply.

"relevant South Australian Department" means the Department of State of South Australia that deals with energy supply.

2   References to diagrams and drawings

                   In this Schedule, a reference to a diagram or drawing (other than Diagram 1 or Diagram 2) is a reference to the diagram or drawing as in force on 30 June 2014.

3   Points and flanges for gas processing plants

                   The following table sets out, in column 2, points and flanges on pipelines that convey natural gas from the gas processing plants mentioned in column 1.

Note:          Under paragraph (a) of the definition of natural gas supply pipeline , anything upstream of a point or flange mentioned in this Schedule is not a natural gas supply pipeline.

 

Points and flanges for gas processing plants

 

Column 1

Gas processing plant

Column 2

Point or flange

1

Ballera, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 24 under the Petroleum Act 1923 (Qld), the 2 flanges on the upstream sides of 2 isolating valves upstream of where the pipeline separates into 2 parallel meter runs, as shown on diagram Y, Ballera Gas Centre--SWQ Unit--Epic Pipeline, and marked "CC" and "DD" on the diagram held by the relevant Queensland Department at Brisbane.

In respect of the pipeline mentioned in pipeline licence PPL no. 41 under the Petroleum Act 1923 (Qld), the pipe weld on the upstream side of the insulating joint leading to the 2 meter runs operated as part of the Ballera-Mount Isa Pipeline, as shown on diagram Z, Ballera Gas Centre--SWQ Unit--Ballera, and marked "EE" on the diagram held by the relevant Queensland Department at Brisbane.

2

Beharra Springs, Western Australia

In respect of the pipeline that is the subject of pipeline licence PL18 under the Petroleum Pipelines Act 1969 (WA), the upstream flange of the insulated flange joint that:

(a) is immediately upstream of the first barred tee downstream of the pig launcher; and

(b) is on the through line of the tee.

3

Central Treatment, Westgrove, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 11 under the Petroleum Act 1923 (Qld), the 200NB class 900 flange located approximately 0.7 m away from the plant's main 200NB pipeline and pig launching facility immediately downstream of the plant's 200NB class 900 main isolation valve, as shown on P & ID Drawing No. 3100-10-0020 Rev 6.

4

Daandine, Queensland

The exit flange or connection point associated with the Daandine central gas processing plant where the exit lateral connects to the outlet of the plant.

5

Darwin LNG, Northern Territory

The exit point N2 (Nozzle 2) at the loading arms on the jetty.

6

Dawson River Central, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 26 under the Petroleum Act 1923 (Qld), the 150NB class 600 flange located immediately downstream of the 150NB class 600 isolation valve at the tie-in station, as shown on P & ID Drawing No. DR--11014 Rev 1.

7

Devil Creek, Western Australia

In respect of the pipeline that is mentioned in pipeline licence PL86 under the Petroleum Pipelines Act 1969 (WA), exit point number I1-04 that is located:

(a) at the custody transfer welded tie-in point (TIP-002) downstream of valve SDV3Z6000, approximately 95 m downstream of the Devil Creek compound meter station; and

(b) below the ground at the northern boundary of the 30 m wide Dampier to Bunbury natural gas pipeline easement.

8

Dongara, Western Australia

In respect of the pipeline that is the subject of pipeline licence PL1 under the Petroleum Pipelines Act 1969 (WA), the upstream flange of the flange joint at the inlet end of the isolating valve that is at the inlet to the pipeline inlet gas flow meter.

9

Gilmore, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 15 under the Petroleum Act 1923 (Qld), the upstream flange of the actuated slamshut valve XV-0305 that is located on the metering skid downstream of the gas flow measurement, as shown on Energy Equity's P & I Drawing No. G101-40F-0004.

10

Gorgon Project, Western Australia

In respect of the pipeline linking the Gorgon Project gas processing facility on Barrow Island and the Dampier to Bunbury natural gas pipeline, the outlet face of the flange forming part of the Gorgon Project facility which meets the Dampier to Bunbury natural gas pipeline.

11

Griffin, Western Australia

In respect of the pipeline that is the subject of pipeline licence PL19 under the Petroleum Pipelines Act 1969 (WA), the downstream flange of the flange joint that connects the 200 mm Griffin Gas Header pipe with the 200 mm pipe connecting with the 250 mm pipe to the pipeline meter station.

12

Iona, Victoria

In respect of the pipeline conveying natural gas from the plant to the Victorian gas transmission grid, the exit flange downstream of meter FT463081, which has a metering installation registration number 30000154PC.

In respect of the pipeline conveying natural gas from the plant to the South Australian gas transmission grid, the connection upstream of South East Australia Gas (SEA Gas) pipeline meter FT9207 in the secure fenced SEA Gas yard located at the plant.

13

Katnook Plant, South Australia

The insulating flange that is located 1 m inside the boundary fence of the plant, upstream of the pipeline branch to Safries and downstream of the emergency shut down skid, as shown on drawing 107.5.1 held by the relevant South Australian Department at Adelaide.

14

Kincora, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 3 under the Petroleum Act 1923 (Qld), the 150NB class 600 flange immediately downstream of the Kincora Gas Plant's 150NB class 600 actuated isolation valve, as shown on P & ID Drawing No. 600-1001 Rev 3.

15

Kogan North, Queensland

The flange or point associated with the Kogan North central gas processing plant where the exit lateral connects to the outlet of the gas meter at the plant.

16

Lang Lang, Victoria

In respect of the pipeline conveying natural gas from the Lang Lang gas plant to the South Gippsland pipeline (pipeline licence number VIC/PL261), the 4 inch flange immediately outside the fence of the plant.

In respect of the pipeline conveying natural gas from the Lang Lang gas plant to the Lang Lang pipeline (pipeline licence number VIC/PL265), the 6 inch underground flange inside the fence of the pipeline station at the plant.

In respect of the pipeline conveying natural gas from the Lang Lang gas plant to the Pakenham Station, the last flange upstream of the flow metering skid at the station.

17

Longford gas processing plant, Garretts Road, Longford, Victoria

The exit flanges contained within the Longford Metering Station at Garretts Road, Longford, Victoria, that are connected to the two 600 mm pipes from the gas processing plant to the Longford Metering Station and are:

(a) the 600 mm weld on the 750 mm x 600 mm reducer; and

(b) the upstream flange face of the 600 mm branch valve; and

(c) the 600 mm weld 3 000 mm downstream on the side arm of the 600 mm equal tee;

all of which are immediately upstream of the metering runs which form a part of the Longford Metering Station.

18

Mereenie Gas Plant, Northern Territory

In respect of the Mereenie Gas Pipeline--the flange:

(a) shown as the insulating flange (I.F.) on the drawing titled Amadeus Basin to Darwin Pipeline Mereenie Meter Station--P & I Diagram Inlet and Station Limit Valve--Drawing Number AD M000-7002 (Revision D of 25.2.86) held by the relevant Northern Territory Department at Darwin; and

(b) situated at the Mereenie Gas Plant immediately inside the perimeter fence and downstream of the main gas plant.

19

Moomba Plant, South Australia

In respect of the pipeline conveying natural gas from the Moomba natural gas processing plant to Adelaide, the insulating joint situated between the meter station for the pipeline and EPIC's after cooler (as indicated in Diagram 1).

In respect of the pipeline conveying natural gas from the Moomba natural gas processing plant to Sydney, the downstream weld of the 600 mm x 750 mm reducer situated, upstream of the insulation flange, between the meter station and East Australian Pipeline Ltd's mainline 750 mm valve on the outlet of the meter station (as indicated in Diagram 2).

20

Moranbah, Queensland

The exit flange or connection point associated with the Moranbah upstream producing operation at the point where the North Queensland gas pipeline connects to the outlet of the gas meter at the plant.

21

Moura Central, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 26 under the Petroleum Act 1923 (Qld), the 150NB class 600 flange located immediately downstream of the 150NB class 600 isolation valve at the tie-in station pit, as shown on P & ID Drawing No. DR--11014 Rev 1.

22

Moura Mine, Queensland

In respect of the pipeline mentioned in mining lease ML no. ML 80032 under the Mineral Resources Act 1989 (Qld), the downstream face of the flanged ball valve SLV 0202 located between the dehydration unit and the launcher station, as shown on Drawings Nos NP03777-P11 and NP03777-P77.

23

North West Shelf Gas Project Domestic Gas, Western Australia

In respect of the pipeline that is the subject of pipeline licence PL40 under the Petroleum Pipelines Act 1969 (WA), the upstream flange of the flange joint immediately upstream of the most upstream of the monolithic insulation joints that are inside the fence of the pipeline's Dampier facilities compound.

24

Otway, Victoria

In respect of the pipeline conveying natural gas from the plant to the Iona gas plant, the last flange or joint inside the Otway gas processing plant.

In respect of the pipeline conveying natural gas from the plant to the SEA gas pipeline (pipeline licence number VIC/PL239), the last flange or joint inside the plant.

In respect of the pipeline conveying natural gas from the plant to the South West pipeline (pipeline licence number VIC/PL231), the last flange or joint inside the plant.

25

Palm Valley Gas Plant, Northern Territory

In respect of the Palm Valley Gas Pipeline, the flange:

(a) shown as the insulating flange on the drawing titled Palm Valley--Alice Springs Gas Pipe Line Well-Head Assembly--Drawing Number 10-011 (Revision 6 of 8/84) held by the relevant Northern Territory Department at Darwin; and

(b) situated at the plant immediately inside the perimeter fence downstream of the main gas plant and immediately upstream of the launching system.

26

Peat, Queensland

The 100NB class 900 flange located immediately downstream of the plant shut down valve that is immediately downstream of the moisture analyser.

27

Rolleston, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 10 under the Petroleum Act 1923 (Qld), the 150NB class 900 flange located immediately downstream of the 150NB class 900 isolation valve that is immediately downstream of the moisture analyser on the plant's sales gas metering facility, as shown on P & ID Drawing No. 3500-10-0020 Rev 5.

28

Rosalind Park, Camden, New South Wales

In respect of the pipeline mentioned in pipeline licence no. 30 under the Pipelines Act 1967 (NSW), the 150NB flange located approximately 2 m upstream of the pipeline insulating joint and immediately downstream of the plant's sales gas metering facility.

29

Spring Gully, Queensland

In respect of the pipeline linking the plant and the Spring Gully to Wallumbilla pipeline, the 250NB class 900 flange located in line 250-SG-001-#900-000 immediately upstream of the Spring Gully to Wallumbilla pipeline pig launcher PL8000-03.

In respect of the pipeline conveying natural gas from the plant to the Gooimbah lateral pipeline, the 200NB class 900 flange located in line 200-SG-001-C905-011 immediately upstream of the take-off for pressure transmitter number PIT 011-001.

30

Strathblane, Queensland

In respect of the pipeline linking the plant and the Spring Gully to Wallumbilla pipeline, the 250NB class 900 flange located in line 250-SG-001-#900-000 immediately upstream of the Spring Gully to Wallumbilla pipeline pig launcher PL8000-03.

In respect of the pipeline conveying natural gas from the plant to the Gooimbah lateral pipeline, the 200NB class 900 flange located in line 200-SG-001-C905-011 immediately upstream of the take-off for pressure transmitter number PIT 011-001.

31

Talinga, Queensland

The 250NB class 900 flange located immediately upstream of the spectacle blind that is immediately upstream of the DN250 class 900 Talinga Meter Station shutdown valve SDV 030-002.

32

Taloona, Queensland

The 200NB class 900 flange located in line 200-SG-408-C900-500 immediately upstream of the pipeline tie-in valve and split tee located at approximately KP 11.37 on the Spring Gully to Wallumbilla pipeline.

33

Tipton West, Queensland

The exit flange or connection point associated with the Tipton West central gas processing plant where the exit lateral connects to the outlet of the gas meter at the plant.

34

Tubridgi, Western Australia

In respect of the pipeline that is the subject of pipeline licence PL16 under the Petroleum Pipelines Act 1969 (WA), the downstream flange of the plant exit shut down valve that:

(a) is between the pipeline pig launcher and the pipeline meter station; and

(b) is the first shut down valve downstream of the connection to the 150 mm pipe from the filter separator.

35

Varanus Island Hub, Western Australia

In respect of the pipeline linking the plant and the Dampier to Bunbury natural gas pipeline, the insulation gasket located inside the Harriet CS1 meter compound upstream of DBNGP valve ZV1 between the Harriet CS1 meter station and the mainline interconnecting pipe.

In respect of the pipeline conveying natural gas from the plant to the Goldfields gas transmission pipeline, the flange connection located inside the Harriet CS1 meter compound approximately 4 m downstream of valve HV5134.

36

Wungoona J.V, Wallumbilla, Queensland

In respect of the pipeline mentioned in pipeline licence PPL no. 2 (Wallumbilla to Brisbane) under the Petroleum Act 1923 (Qld), the flange located immediately upstream of the series of valves before the meter run, as shown on diagram W, Wungoona JV-RBP ML 1A Metering Station, and marked "AA" on the diagram held by the relevant Queensland Department at Brisbane.

In respect of the pipeline mentioned in pipeline licence PPL no. 30 under the Petroleum Act 1923 (Qld), the pipe weld on the upstream side of an insulating joint located immediately upstream of the main flow control valve, as shown on diagram X, Wungoona JV--Duke Energy Pipeline, and marked "BB" on the diagram held by the relevant Queensland Department at Brisbane.

 

 

 

145  Schedule 1 (note to table)

Omit "person", substitute "corporation".

146  Source 1 of Part 6 of Schedule 3 (paragraph (i) of the cell at table item 1, column headed "Matters to be identified")

Omit "legacy".

147  Source 1 of Part 6 of Schedule 3 (paragraph (j) of the cell at table item 1, column headed "Matters to be identified")

Repeal the paragraph.

148  Source 1 of Part 6 of Schedule 3 (paragraph (k) of the cell at table item 1, column headed "Matters to be identified")

Omit all the words after "combustion".

149  Source 1 of Part 6 of Schedule 3 (paragraph (l) of the cell at table item 1, column headed "Matters to be identified")

Omit all the words after "offsite".

150  Source 1 of Part 6 of Schedule 3 (paragraph (m) of the cell at table item 1, column headed "Matters to be identified")

Omit all the words after "flared".

151  Source 1 of Part 6 of Schedule 3 (paragraph (j) of the cell at table item 2, column headed "Matters to be identified")

Omit "legacy".

152  Source 1 of Part 6 of Schedule 3 (paragraph (k) of the cell at table item 2, column headed "Matters to be identified")

Repeal the paragraph.

153  Source 1 of Part 6 of Schedule 3 (paragraph (l) of the cell at table item 2, column headed "Matters to be identified")

Omit all the words after "combustion".

154  Source 1 of Part 6 of Schedule 3 (paragraph (m) of the cell at table item 2, column headed "Matters to be identified")

Omit all the words after "transferred", substitute "offsite".

155  Source 1 of Part 6 of Schedule 3 (paragraph (n) of the cell at table item 2, column headed "Matters to be identified")

Omit all the words after "flared".

156  Source 2 of Part 6 of Schedule 3 (paragraph (a) of the cell at table item 1, column headed "Matters to be identified")

Omit "tonnes", substitute "kilolitres".

157  Source 2 of Part 6 of Schedule 3 (paragraph (a) of the cell at table item 2, column headed "Matters to be identified")

Omit "tonnes", substitute "kilolitres".

Part 2 -- Application and transitional provisions

National Greenhouse and Energy Reporting Regulations 2008

158  After Part 6

Insert:

Part 7 -- Application and transitional provisions

Division 7.1 -- Application and transitional provisions relating to the National Greenhouse and Energy Reporting Amendment (2014 Measures No. 1) Regulation 2014

7.01   Definitions

                   In this Part:

"continuing Act" means the National Greenhouse and Energy Reporting Act 2007 as it continues to apply because of item 337 of Schedule 1 to the Clean Energy Legislation (Carbon Tax Repeal) Act 2014 .

"old regulations" means these regulations as in force immediately before the commencement of the National Greenhouse and Energy Reporting Amendment (2014 Measures No. 1) Regulation 2014 .

7.02   Transitional--continuation of old regulations

                   Despite the amendments of the old regulations made by Part 1 of Schedule 1 to the National Greenhouse and Energy Reporting Amendment (2014 Measures No. 1) Regulation 2014 , the old regulations continue to apply, for the purposes of the operation of the continuing Act, as if those amendments had not been made.

7.03   Application--reports under sections 19, 22G and 22X of Act

             (1)  The amendments of the old regulations made by Part 1 of Schedule 1 to the National Greenhouse and Energy Reporting Amendment (2014 Measures No. 1) Regulation 2014 , so far as they relate to reports under section 19 of the Act, apply in relation to reports for:

                     (a)  the financial year beginning on 1 July 2014; or

                     (b)  a later financial year.

             (2)  The amendments of the old regulations made by Part 1 of Schedule 1 to the National Greenhouse and Energy Reporting Amendment (2014 Measures No. 1) Regulation 2014 , so far as they relate to reports under section 22G or 22X of the National Greenhouse and Energy Reporting Act 2007 , apply in relation to reports for:

                     (a)  the financial year beginning on 1 July 2014; or

                     (b)  a later financial year.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback