Commonwealth Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Download] [Help]

OZONE PROTECTION AND SYNTHETIC GREENHOUSE GAS MANAGEMENT LEGISLATION AMENDMENT (2017 MEASURES NO. 1) REGULATIONS 2017 (F2017L00964) - SCHEDULE 3

Amendments commencing 1 January 2020

   

Ozone Protection and Synthetic Greenhouse Gas Management Regulations 1995

1  Regulation 2

Insert:

"replacement part " does not include a complete, or substantially complete, indoor or outdoor unit of a split system air conditioning unit.

2  Subregulations 3(5) and (8)

Repeal the subregulations.

3  At the end of regulation 3E

Add:

                   ; (c)  importing replacement parts for existing HCFC refrigeration or air conditioning equipment;

                     (d)  importing equipment insulated with foam manufactured with HCFC;

                     (e)  importing equipment for which the Minister considers it would be impracticable:

                              (i)  for the importer or licence holder to comply with the ban in paragraph 13(1)(c) of the Act; and

                             (ii)  to remove or retrofit the equipment because it is incidental to the main import.

Example:    For subparagraph (e)(ii), air conditioning equipment incorporated into a large boat or drilling rig.

4  Part 5

Repeal the Part.

5  Subregulation 900(3) (table item 2, columns 1 and 2)

Omit "ODS equipment or".

6  Subregulation 900(3) (table item 2, subparagraph (c)(i) of column 2)

Repeal the subparagraph.

7  Subregulation 900(5)

Omit "ODS equipment or" (wherever occurring).



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback