[1] Subregulation 3 (1), after definition of Act
"AS, AS/NZS or Australian Standard" followed by a number (for example, AS/NZS 3000:2007) means a standard of that number issued by Standards Australia Limited and, if a date is included, of that date.
[2] After subparagraph 20AC (5) (a) (ii)
insert
(iii) that the installer has public liability insurance of at least $5 million; and
(iv) that the installer:
(A) is bound by the Clean Energy Council's Code of Conduct; and
(B) has complied with that code of conduct for the installation of the unit; and
[3] Paragraph 20AC (5) (c)
omit
standards.
insert
standards; and
[4] After paragraph 20AC (5) (c)
insert
(d) a written statement by the installer of the unit that the installation complies with the following as in force from time to time:
(i) AS/NZS 3000:2007, Wiring Rules ;
(ii) AS/NZS 1768:2007, Lightning protection ;
(iii) if the unit is an on-grid system -- AS 4777--2005, Grid connection of energy systems via inverters ; and
(e) for a unit that is a solar (photovoltaic) system:
(i) a written statement by the installer of the unit that the installation complies with the following as in force from time to time:
(A) AS/NZS 5033:2005, Installation of photovoltaic (PV) arrays ;
(B) AS/NZS 1170.2:2002, Structural design actions , Part 2: Wind actions ; and
(C) if the unit is an off-grid system -- AS/NZS 4509.1:2009, Stand-alone power systems , Part 1: Safety and installation and AS 4086.2--1997, Secondary batteries for use with stand-alone power systems , Part 2: Installation and maintenance ; and
(ii) a written statement by the installer of the unit that the installer has at the time of the installation used a model of a photovoltaic module listed in AS/NZS 5033 Compliant PV Modules as in force from time to time and available at http://www.cleanenergycouncil.org.au ; and
(iii) if the system uses an inverter -- a written statement by the installer of the unit that the installer has at the time of the installation used a model of grid-connect inverter listed in Tested and Approved Grid Connected Inverters as in force from time to time and available at http://www.cleanenergycouncil.org.au ; and
(f) for a unit that is a wind system -- a written statement by the installer of the unit that the installation complies with the following as in force from time to time:
(i) AS/NZS 1170.2:2002, Structural design actions , Part 2: Wind actions ;
(ii) if the unit is an off-grid system -- AS/NZS 4509.1:2009, Stand-alone power systems , Part 1: Safety and installation and AS 4086.2--1997, Secondary batteries for use with stand-alone power systems , Part 2: Installation and maintenance .
Note For subparagraph (a) (iv), the Clean Energy Council's Code of Conduct is available at http://www.cleanenergycouncil.org.au .
[5] Subregulation 22W (1)
omit
31 October 2010.
insert
1 December 2010.
[6] Subregulation 22W (2)
omit
1 January 2011.
insert
14 January 2011.
[7] Subregulation 22X (1)
omit
1 January
insert
31 March
[8] After Part 3A, Division 8
insert
Division 8A Information for partial exemption certificates
22ZSA Requirement to give information
For paragraph 46D (1) (a) of the Act, the information is information about all of the following:
(a) the emissions of greenhouse gases for the activity;
(b) the electricity used by the activity;
(c) the revenue generated by the activity.
[9] Schedule 6, subitem 625 (2)
after
tonne of
insert
100% equivalent zinc contained within