SYDNEY HARBOUR TUNNEL (PRIVATE JOINT VENTURE) ACT 1987 - SCHEDULE 2

SCHEDULE 2 – The ancillary works

(Section 2)

1

Works carried out on an ancillary site for or associated with the fabrication of components for use in connection with the tunnelling works.

2

Works carried out on an ancillary site for or associated with the extraction, transport or storage of materials for use in connection with the tunnelling works.

3

The location and establishment of new services and the re-location and re-establishment of existing services rendered necessary by the carrying out of the works referred to in items 1 and 2 of this Schedule.

4

Such works for the protection of the environment as the Commissioner may consider desirable or necessary as a consequence of the carrying out of any of the works referred to in items 1 and 2 of this Schedule.

5

Works the use of which is ancillary or incidental to any of the works referred to in the other items of this Schedule.