New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
MAITLAND LOCAL ENVIRONMENTAL PLAN 2011
- Made under the Environmental Planning and Assessment Act 1979
- As at 20 September 2024
- Reg 681 of 2011
TABLE OF PROVISIONS
PART 1 - PRELIMINARY
1.1. Name of Plan
1.1AA. Commencement
1.2. Aims of Plan
1.3. Land to which Plan applies
1.4. Definitions
1.5. Notes
1.6. Consent authority
1.7. Maps
1.8. Repeal of planning instruments applying to land
1.8A. Savings provision relating to development applications
1.9. Application of SEPPs
1.9A. Suspension of covenants, agreements and instruments
PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT
2.1. Land use zones
2.2. Zoning of land to which Plan applies
2.3. Zone objectives and Land Use Table
2.4. Unzoned land
2.5. Additional permitted uses for particular land
2.6. Subdivision--consent requirements
2.7. Demolition requires development consent
2.8. Temporary use of land
2.9. Canal estate development prohibited
Land Use Table
Note
Zone RU1 - Primary Production
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone RU2 - Rural Landscape
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone R1 - General Residential
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone R5 - Large Lot Residential
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone E1 - Local Centre
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone E2 - Commercial Centre
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone E3 - Productivity Support
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone E4 - General Industrial
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone MU1 - Mixed Use
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone SP1 - Special Activities
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone SP2 - Infrastructure
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone SP3 - Tourist
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone RE1 - Public Recreation
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone RE2 - Private Recreation
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone C2 - Environmental Conservation
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone C3 - Environmental Management
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
Zone C4 - Environmental Living
1. Objectives of zone
2. Permitted without consent
3. Permitted with consent
4. Prohibited
PART 3 - EXEMPT AND COMPLYING DEVELOPMENT
3.1. Exempt development
3.2. Complying development
3.3. Environmentally sensitive areas excluded
PART 4 - PRINCIPAL DEVELOPMENT STANDARDS
4.1. Minimum subdivision lot size
4.1AA. Minimum subdivision lot size for community title schemes
4.1A. Exceptions to minimum lot sizes in Zone R1
4.2. Rural subdivision
4.2A. Erection of dwelling houses on land in certain rural and conservation zones
4.2B. No strata plan subdivision in certain rural, residential or conservation zones
4.2C. Minimum subdivision lot sizes for certain split zones
4.3. Height of buildings
4.4. Floor space ratio
4.5. Calculation of floor space ratio and site area
4.6. Exceptions to development standards
PART 5 - MISCELLANEOUS PROVISIONS
5.1. Relevant acquisition authority
5.1A. Development on land intended to be acquired for public purposes
5.2. Classification and reclassification of public land
5.3. Development near zone boundaries
5.4. Controls relating to miscellaneous permissible uses
5.5. Controls relating to secondary dwellings on land in a rural zone
5.6. Architectural roof features
5.7. Development below mean high water mark
5.8. Conversion of fire alarms
5.9. Dwelling house or secondary dwelling affected by natural disaster
5.9AA. (Repealed)
5.10. Heritage conservation
5.11. Bush fire hazard reduction
5.12. Infrastructure development and use of existing buildings of the Crown
5.13. Eco-tourist facilities
5.14. Siding Spring Observatory--maintaining dark sky
5.15. Defence communications facility
5.16. Subdivision of, or dwellings on, land in certain rural, residential or conservation zones
5.17. Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
5.18. Intensive livestock agriculture
5.19. Pond-based, tank-based and oyster aquaculture
5.20. Standards that cannot be used to refuse consent--playing and performing music
5.21. Flood planning
5.22. Special flood considerations
5.23. Public bushland
5.24. Farm stay accommodation
5.25. Farm gate premises
PART 6 - URBAN RELEASE AREAS
6.1. (Repealed)
6.2. Public utility infrastructure
6.3. Development control plan
6.4. Relationship between Part and remainder of Plan
PART 7 - ADDITIONAL LOCAL PROVISIONS
7.1. Acid sulfate soils
7.2. Earthworks
7.3. (Repealed)
7.4. Riparian land and watercourses
7.5. Significant extractive resources
7.6. Location of sex services premises
7.7. Certain development at Racecourse Road, Rutherford
7.8. Subdivision of land in Zone R1 in Anambah Urban Release Area
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
Dictionary
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback