The operator of a determined major hazard facility must provide the regulator with a safety case outline for the major hazard facility within 3 months after the facility is determined to be a major hazard facility.
: Maximum penalty--(a) in the case of an individual--40 penalty units, or(b) in the case of a body corporate--210 penalty units.