This legislation has been repealed.
A licensee must forward the following information, in writing, to the Director-General within 28 days after obtaining the information:
(a) any review of the suitability of pressure-control and over-pressure protection systems carried out in accordance with AS 2885.3 ,
(b) any investigation of the condition of a pipeline and any limits for its continued safe operation beyond its design life carried out in accordance with AS 2885.3 ,
(c) the results of any testing of the integrity of the pipeline carried out as the result of a particular occurrence,
(d) any periodic audit and assessment of a pipeline carried out in accordance with AS 2885.3 ,
(e) the results of any planned emergency simulations.
Maximum penalty: 10 penalty units.