NORTH EAST GAS INTERCONNECTOR PIPELINE (SPECIAL PROVISIONS) ACT 2015 - SECT 7

Waterway crossing

    (1)     The Pipeline licensee may construct and operate the Pipeline across a waterway if:

        (a)     any requirements under a law of the Commonwealth that must be satisfied have been satisfied; and

        (b)     the Water Minister has given written approval for the construction and operation of the Pipeline across the waterway.

    (2)     The following conditions apply to the approval:

        (a)     unless the instrument of approval otherwise provides – a condition that a project participant must not:

            (i)     prevent, restrict or interfere with the passage of vessels on the waterway; or

            (ii)     divert or use water in the waterway; or

            (iii)     obstruct the flow of water in the waterway;

        (b)     any other conditions determined by the Water Minister that are:

            (i)     stated in the instrument of approval; or

            (ii)     notified to the Pipeline licensee by the Water Minister.