COAL MINING SAFETY AND HEALTH REGULATION 2017 - REG 32
Drawings of electrical installations
32 Drawings of electrical installations
(1) The site senior executive for a coal mine must ensure up-to-date drawings
of the mine’s electrical installations are available for use at the mine
when electrical equipment and electrical installations are commissioned or
modified.
(2) The drawings must be updated as soon as practicable, but not
later than 8 days, after— (a) the commissioning of any electrical equipment
or electrical installation at the mine; or
(b) any major modification to
electrical equipment or an electrical installation at the mine.
(3) The
drawings must be kept in a location that is easily accessible by each coal
mine worker authorised by an electrical supervisor or the coal mine’s
electrical engineering manager to access the drawings.