The site senior executive for a coal mine must ensure—
(a) a datum station, referenced to GDA and AHD, is established near the mine for mine surveys; and
(b) if a local grid system is used for the surveys, the relationship between the grid system and GDA and AHD is established and shown on the survey plans.