(1) This section applies in relation to a relevant authorisation if, immediately before the commencement—(a) a validation inspection was required to be carried out on a meter attached to works through which water is taken under the authorisation because—(i) the revalidation period for the authorisation under former section 111 had started in relation to the meter; or(ii) the chief executive had given the holder of the authorisation a notice under former section 112A requiring the holder to arrange another validation inspection on the meter; and(b) the validation inspection had not been started on the meter; and(c) the validation date for the validation inspection had not passed.
(2) The holder of the relevant authorisation may arrange for a validation inspection to be carried out on the meter before the validation date.
(3) If the holder of the relevant authorisation arranges a validation inspection under subsection (2), former section 112 continues to apply in relation to the validation inspection as if the amendment regulation had not been made.Note—See subdivision 5 in relation to validation inspections finalised after the commencement.
(4) If the holder of the relevant authorisation does not arrange a validation inspection under subsection (2), section 151(2) stops applying to the meter on the validation date.
(5) In this section—
"validation date" , for a validation inspection mentioned in subsection (1)(a), means—(a) if subsection (1)(a)(i) applies—the revalidation date for the relevant authorisation applying under former section 111; or(b) if subsection (1)(a)(ii) applies—the expiry date applying under former section 112A.