Section 756--
insert--
'(2) Sections 757 to 759 also apply for any coal or oil shale mining lease granted for an application made before 31 December 2004 if the land the subject of the application was not in the area of a petroleum tenure.
'(3) For applying subsection (2), the definition relevant period in section 758(4) is taken to be as follows--
relevant period means 6 months after the first anniversary of the grant of the lease.'.