(1) Schedule 3, definition private isolated railway—
omit.
(2) Schedule 3—
insert—
'disclosing person see section 267B(1).
low risk railway means a railway not connected to or associated with—
(a) railway tracks, or any other rail infrastructure, of another railway; or
(b) a rail or public road crossing.
rail or public road crossing means a part of a public road's road transport infrastructure, as defined under the Transport Infrastructure Act 1994, schedule 6, that is—
(a) a level crossing as defined under the Queensland Road Rules, section 120; or
(b) an area where a footpath, as defined under the Transport Operations (Road Use Management) Act 1995, schedule 4, crosses a railway at substantially the same level; or
(c) an area where a shared path, as defined under the Queensland Road Rules, section 242, crosses a railway at substantially the same level; or
(d) a bridge carrying a public road over a railway; or
(e) a bridge carrying a railway over a public road; or
(f) a lane of a public road on which rolling stock moves alongside road vehicles on the public road.'.
(3) Schedule 3, definition rail or road crossing, paragraph (b), after 'Transport'—
insert—
'Operations'.