(1) A licensee who
installs or alters downhole equipment must furnish to the Minister, within
2 months after the installation or alteration, a "downhole diagram in
accordance with the requirements of these regulations.
Administrative penalty.
(2) A downhole diagram
must—
(a)
include details on the equipment that has been installed, or information on
the alterations; and
(b) show
the perforated intervals; and
(c)
state the date on which the particular equipment became operable, or on which
the alteration occurred; and
(d)
state the status of the well; and
(e)
include details of any reservoir stimulation treatments that have been
undertaken.
(3) A copy of the
diagram under this regulation will be available for public inspection after
the expiration of 6 months from the date of the installation or
alteration of the equipment (as the case may be).