South Australian Current Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

ENERGY RESOURCES REGULATIONS 2013 - REG 44

44—Downhole diagrams

        (1)         A licensee who installs or alters downhole equipment must furnish to the Minister, within 2 months after the installation or alteration, a "downhole diagram in accordance with the requirements of these regulations.

Administrative penalty.

        (2)         A downhole diagram must—

            (a)         include details on the equipment that has been installed, or information on the alterations; and

            (b)         show the perforated intervals; and

            (c)         state the date on which the particular equipment became operable, or on which the alteration occurred; and

            (d)         state the status of the well; and

            (e)         include details of any reservoir stimulation treatments that have been undertaken.

        (3)         A copy of the diagram under this regulation will be available for public inspection after the expiration of 6 months from the date of the installation or alteration of the equipment (as the case may be).



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback