South Australian Current Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

PETROLEUM (SUBMERGED LANDS) REGULATIONS 2020 - REG 73

73—Revision after 5 years

        (1)         The operator of a facility for which a safety case is in force must submit a revised safety case to the Safety Authority—

            (a)         5 years after the date that the safety case was first accepted under regulation 67; and

            (b)         5 years after the date of each acceptance of a revised safety case under regulation 75,

whether or not a revision under regulation 71 or 72 has been accepted within the 5 year period.

        (2)         A revised safety case submitted under this regulation must describe the means by which the operator will ensure the ongoing integrity of the technical and other control measures identified by the formal safety assessment for the facility.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback