A design verifier of the design of an item of plant specified in Part 1
of Schedule 5 must document the design verification process carried out
by that person and the results of that process.
Maximum penalty:
(a) In
the case of an individual—$3 600.
(b) In
the case of a body corporate—$18 000.
Expiation fee:
(a) In
the case of an individual—$432.
(b) In
the case of a body corporate—$2 160.