464—Asbestos removal control plan
(1) A licensed
asbestos removalist must prepare an asbestos removal control plan for any
licensed asbestos removal work the removalist is commissioned to undertake.
Maximum penalty:
(a) In
the case of an individual—$6 000.
(b) In
the case of a body corporate—$30 000.
(2) An asbestos
removal control plan must include—
(a)
details of how the asbestos removal will be carried out, including the method
to be used and the tools, equipment and personal protective equipment to be
used; and
(b)
details of the asbestos to be removed, including the location, type and
condition of the asbestos.
(3) The licensed
asbestos removalist must give a copy of the asbestos removal control plan to
the person who commissioned the licensed asbestos removal work.
Maximum penalty:
(a) In
the case of an individual—$3 600.
(b) In
the case of a body corporate—$18 000.
Expiation fee:
(a) In
the case of an individual—$432.
(b) In
the case of a body corporate—$2 160.