12—Insertion of regulation 76A
After regulation 76 insert:
76A—Preparation and approval of metering installation procedures
A metering provider must—
(a) prepare, maintain and periodically revise metering installation procedures in relation to meters installed by or on behalf of the metering provider; and
(b) obtain the approval of the Technical Regulator to the procedures and any revision.