South Australian Numbered Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
ELECTRICITY (GENERAL) REGULATIONS 2012 (NO 199 OF 2012)
- under the Electricity Act 1996
TABLE OF PROVISIONS
PART 1--Preliminary
1. Short title
2. Commencement
3. Interpretation
4. Interpretation--definition of annual electricity consumption level
5. Interpretation--definition of electrical installation
6. Interpretation--definition of electricity infrastructure
7. Interpretation--definition of generation
8. Interpretation--definition of small customer
9. Interpretation--definition of retailing
10. Interpretation--definition of electricity supply industry
11. Compliance with standards that are varied or substituted
PART 2--Administration
12. Functions and powers of Commission
13. Functions of Technical Regulator--major interruptions to electricity supply
14. Function associated with use of emergency powers
PART 3--Licensing of electricity entities
15. Exemptions from requirement to be licensed
16. Licence fees and returns
17. Consideration of application for licence
18. Prescribed class of customers for purposes of section 24(2)(b) of Act
19. Prescribed date for purposes of section 24(2)(d) of Act
20. Prescribed information in small customer accounts for purposes of section 24(2)(da) of Act
21. Ombudsman scheme
PART 4--Residential Energy Efficiency Scheme
22. Application
23. Interpretation
24. Minister to set greenhouse gas reduction targets
25. Minister to determine percentage of greenhouse gas reduction target to be delivered to priority group households
26. Minister to set energy audit targets
27. Administration
28. Notification and adjustment of targets
29. Energy audits
30. Energy efficiency activities
31. Energy efficiency activities for priority group households
32. Determination of energy efficiency activities
33. Retailers may enter into arrangements
34. Compliance and reporting
35. Energy efficiency shortfalls
36. Review
37. Expiry
PART 5--System controller
38. Functions and powers of system controller
PART 6--Standard terms and conditions for sale or supply
39. Prescribed classes of customers
PART 7--Special provisions relating to small customers
40. Interpretation
41. Exemption from standing contract condition
42. Provisions relating to default contracts
PART 8--Electricity entities' powers and duties
43. Carrying out certain work on public land
PART 9--Undergrounding of powerlines
44. Prescribed amount for undergrounding work
PART 10--Safety and technical issues Division 1--Safety and technical requirements
45. Purpose of Division
46. Quality of electricity supply
47. General requirements for electricity infrastructure
48. Aerial lines
49. Underground lines
50. Powerlines other than aerial or underground lines
51. Substations
52. Earthing and electrical protection systems
53. Electrical installations
54. Connection testing and inspection procedures
55. General requirements for electrical installation Division 2--Certain electrical installation work
56. Certain electrical installation work and certificates of compliance
57. Certificates of compliance--official forms
58. Prescribed work (section 61(4)) Division 3--Safeguarding persons working with conductors or electrical equipment Subdivision 1--General
59. Basic safety principle
60. Compliance with provisions of Division Subdivision 2--Work on or near live electric conductors or electrical equipment
61. Application of Subdivision
62. Safe work practices
63. Work involving danger of direct contact with live conductors etc
64. Work in proximity to conductors etc Subdivision 3--Work on or near exposed high voltage conductors or electrical equipment
65. Work above exposed high voltage conductors etc
66. Work by direct contact with exposed high voltage conductors etc
67. Live high voltage line work Subdivision 4--Miscellaneous
68. Rescue and resuscitation training
69. Suitability of testing instruments Division 4--Reporting and investigation of accidents
70. Reporting of accidents Division 5--Safety, reliability, maintenance and technical management plans and reports
71. Application of Division
72. Safety, reliability, maintenance and technical management plans
73. Safety, reliability, maintenance and technical management reports
PART 11--Cathodic protection systems
74. Application of Part
75. Tests before operating cathodic protection system
PART 12--Miscellaneous
76. Preparation, approval, publication and purchase of technical installation rules
77. Register of underground lines
78. Protection of underground lines
79. Entangled objects
80. Altering ground levels near infrastructure
81. Erection of buildings in proximity to aerial lines
82. Erection of buildings in proximity to underground lines
83. Prohibition of certain activities in proximity to aerial lines and other cable systems
84. Erection of conductors or other cable systems so as to cross or be attached to existing aerial lines or their supports etc
85. Placement of materials near supporting structures etc
86. Placement of materials, prohibition of burning, in proximity to substations
87. Transportation
88. Interference and obstruction
89. Technical Regulator may grant exemption from Part 10,
90. Exemption of operations associated with electrified railway and tramway
91. Exemption of Techport Australia Common User Shipbuilding Facility operations
92. General penalty
93. Fees for reinspection etc
SCHEDULE 1--Requirements for aerial lines
SCHEDULE 2--Requirements for underground lines and certain other powerlines
SCHEDULE 3--Requirements for substations
SCHEDULE 4--Requirements for earthing and electrical protection systems
SCHEDULE 5--Clearance from aerial lines
SCHEDULE 6--Revocation and transitional provisions
Legislative history
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback