100—Pipeline must have registered operator
(1) A person must
not—
(a)
construct a pipeline; or
(b)
operate a pipeline (whether or not the pipeline is in use at a particular
time); or
(c)
modify a pipeline; or
(d)
decommission a pipeline,
in the adjacent area if there is not an operator in respect of the pipeline.
Maximum penalty: $8 800.
(2) However,
subregulation (1) does not apply to construction, operation, modification
or decommissioning that occurs within 3 months after the commencement of this
regulation.
Subdivision 1—Consent to construct