Tasmanian Numbered Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

ELECTRICITY SAFETY ACT 2022 (NO. 32 OF 2022) - SECT 97

Director may require submission of revised safety management system
(1)  The Director may at any time, by written notice, require an electricity entity, owner or operator to submit a revised safety management system.
(2)  A notice must –
(a) be in writing; and
(b) set out –
(i) the matters to be dealt with by the required revision; and
(ii) the proposed date of effect of the revision; and
(iii) the grounds for the requirement.
(3)  The electricity entity, owner or operator to which the notice is issued may make a submission to the Director on all or any of the following grounds:
(a) that the revision should not occur;
(b) that the revision should be in different terms from the proposed terms;
(c) that the revision should take effect on a later date than the proposed date of effect.
(4)  A submission must –
(a) be in writing; and
(b) state the electricity entity’s, owner’s or operator’s reasons for the submission; and
(c) be made within 28 days, or such longer period as the Director allows in writing, after the day on which notice of the requirement is received.
(5)  If an electricity entity, owner or operator makes a submission under this section, the Director must –
(a) accept the submission or part of the submission and vary or withdraw the requirement accordingly; or
(b) reject the submission.
(6)  The Director must give the electricity entity, owner or operator notice in writing of his or her acceptance or rejection of the submission and the reasons for it.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback