Part 3 of Schedule 1 to the Principal Regulations is amended as follows:(a) by omitting "carriageway) in an area identified in a planning scheme as involving or affecting historic or heritage issues 1 " from item 1 in the table and substituting "carriageway 1 ) in an area identified in a planning scheme as involving or affecting historic or heritage issues" ;(b) by omitting "undertaken" from item 1 in the table and substituting "carried out" ;(c) by omitting item 2 and substituting the following:(d) by omitting item 3 and substituting the following:
3. Gas distribution infrastructure work on a road (other than its carriageway 1 ), being work involving or affecting native vegetation where an on-site or desktop survey conducted by a suitably qualified person (in consultation with the responsible Department in relation to the Threatened Species Protection Act 1995 ) has found that threatened species inhabit or depend on the area around the proposed worksite
The work will be carried out in accordance with a species management or recovery plan prepared by a suitably qualified person, being a plan that
(a) ensures that impacts on the threatened species are avoided or minimised; and
(b) has been approved by the relevant council
(e) by omitting item 4 and substituting the following:
4. Gas distribution infrastructure work on a road (other than its carriageway 1 ), being work involving or affecting native vegetation where an on-site survey carried out by a suitably qualified person (in consultation with the responsible Department in relation to the Nature Conservation Act 2002 ) has identified the presence of priority State or bioregional (forest and non-forest) vegetation (or both)
The work will be carried out in accordance with a vegetation management plan prepared by a suitably qualified person, being a plan that
(a) ensures that impacts on the priority (forest and non-forest) vegetation are avoided or minimised; and
(b) has been approved by the relevant council
5. Gas distribution infrastructure work on a road (other than its carriageway 1 ), or under a waterway, being work
The work will be carried out in accordance with a soil and water management plan prepared by a suitably qualified person with experience in site management, being a plan that
(a) involving or affecting soil or water management issues; and
(a) addresses erosion control practices, sediment control practices and site remediation and revegetation programs; and
(b) requiring the disturbance of 250m 2 (or a greater area) of land that is serviced by a kerb and gutter stormwater system
(b) has been approved by the relevant council
6. Gas distribution infrastructure work on a road (other than its carriageway 1 ), being work of a kind that is not specified in another item of this table
The work is within the scope of the authority conferred by the gas entity's licence
(f) by omittingand substituting the following item:(g) by omitting the following item: