Duty of designers, manufacturers, importers and suppliers of plant
(1)  A designer of plant must ensure that the plant is designed so that its noise emission is as low as is reasonably practicable.
Penalty:  In the case of –
(a) an individual, a fine not exceeding $6 000; or
(b) a body corporate, a fine not exceeding $30 000.
(2)  A designer of plant must give to each person who is provided with the design for the purpose of giving effect to it adequate information about –
(a) the noise emission values of the plant; and
(b) the operating conditions of the plant when noise emission is to be measured; and
(c) the methods the designer has used to measure the noise emission of the plant.
Penalty:  In the case of –
(a) an individual, a fine not exceeding $6 000; or
(b) a body corporate, a fine not exceeding $30 000.
(3)  A manufacturer of plant must ensure that the plant is manufactured so that its noise emission is as low as is reasonably practicable.
Penalty:  In the case of –
(a) an individual, a fine not exceeding $6 000; or
(b) a body corporate, a fine not exceeding $30 000.
(4)  A manufacturer of plant must give to each person to whom the manufacturer provides the plant adequate information about –
(a) the noise emission values of the plant; and
(b) the operating conditions of the plant when noise emission is to be measured; and
(c) the methods the manufacturer has used to measure the noise emission of the plant.
Penalty:  In the case of –
(a) an individual, a fine not exceeding $6 000; or
(b) a body corporate, a fine not exceeding $30 000.
(5)  An importer of plant must take all reasonable steps to –
(a) obtain information about –
(i) the noise emission values of the plant; and
(ii) the operating conditions of the plant when noise emission is to be measured; and
(iii) the methods the designer or manufacturer has used to measure the noise emission of the plant; and
(b) give that information to any person to whom the importer supplies the plant.
Penalty:  In the case of –
(a) an individual, a fine not exceeding $6 000; or
(b) a body corporate, a fine not exceeding $30 000.
(6)  A supplier of plant must take all reasonable steps to –
(a) obtain the information the designer, manufacturer or importer is required to give a supplier under subregulation (2) , (4) or (5) ; and
(b) give that information to any person to whom the supplier supplies the plant.
Penalty:  In the case of –
(a) an individual, a fine not exceeding $6 000; or
(b) a body corporate, a fine not exceeding $30 000.