Port of Portland Authority lease or licence empowered

S. 7(1) amended by Nos 9635/1981 s. 2(2)(Sch. item 40), 10115/1984 s. 11(a).

    (1)     Notwithstanding anything to the contrary in any other Act or in any lease licence proclamation reservation declaration or dedication of or with respect to any land including any berths of the Port of Portland Authority and without limiting the operation of sections 5 and 6 the Governor in Council shall upon such conditions as he thinks fit direct the Port of Portland Authority to grant to the company a lease or licence over any land including any berths vested in the Port of Portland Authority for a term of not more than 99 years to enable the company to construct any part of the conveyor over on or under such land to supply electricity over on or under such land and to operate inspect maintain and replace any part of the conveyor or the said electricity supply.

S. 7(2) amended by No. 10115/1984 s. 11(b)(c).

    (2)     The right title property and possession in or over all improvements fixtures attachments structures of whatever nature or kind in over or under or connected with the conveyor or the said electricity supply shall remain with the company notwithstanding the determination cessation or termination of the lease or licence referred to in the preceding subsection and the same shall be removed by the company at any time during or within twelve months after termination of the said lease or licence unless alternative arrangements satisfactory to the lessor are made.

    (3)     Where the Company determines or terminates the lease or licence or the lease or licence ceases the Company shall take all steps to restore the area concerned to a condition satisfactory to the lessor unless alternative arrangements are made pursuant to subsection (2).