PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
SUMMARY: | |||||
1.00 |
Modifications to North River Bank | | | |
1 401 000 |
2.00 |
Kingsway Bridge Abutments and Enhancements (North Side) | | | |
476 000 |
3.00 |
Low Level Bridge Access Ramps Regrading | | | |
1 338 000 |
4.00 |
Queensbridge Square Works | | | |
3 641 000 |
5.00 |
Queensbridge Square Tunnel Access | | | |
4 309 000 |
6.00 |
Whiteman Street Upgrade Works | | | |
2 904 000 |
7.00 |
Clarendon Street Plaza | | | |
511 000 |
8.00 |
Power Street Extension Roadworks | | | |
719 000 |
9.00 |
Kingsway South Access Ramps | | | |
8 000 000 |
|
TOTAL ESTIMATED COST | | |
23 299 000 |
EXCLUSIONS:
The following items have not been included in the above preliminary cost assessment:
(i) Capital or operating costs of the tram link proposed for Whiteman Street;
(ii) Private Land Acquisition and Transaction Costs;
(iii) Performance Guarantees;
(iv) Interest;
(v) Finance Charges and Establishment.
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
1.00 |
Modifications to North River Bank | | | | |
1.01 |
Construct 2 metre wide timber wharf/pier like structure along river bank at current river edge alignment |
|
|
|
|
|
—blue stone steps |
Item | | |
80 000 |
1.02 |
Pedestrian Promenade Sunday market paving |
|
|
|
|
1.03 |
Boat mooring facilities and fittings to wharf |
| | |
|
1.04 |
Landscaping, grassing and planting including gravel paths |
| | |
|
1.05 |
External seating and civic furniture |
| | |
|
1.06 |
External lighting poles |
Item | | |
45 000 |
| | | | |
1 235 000 |
|
Contingency |
5% | | |
62 000 |
|
Design Fees |
8% | | |
104 000 |
|
Total Modifications to North River Bank |
1 401 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
2.00 |
Kingsway Bridge Abutments and Enhancements (North Side) | | | | |
2.01 |
Obelisk feature tower at each side of bridge, including special lighting |
|
|
|
|
2.02 |
Feature lighting to Kingsway handrails |
| | |
|
| | | | |
420 000 |
|
Contingency |
5% | | |
21 000 |
|
Design Fees |
8% | | |
35 000 |
|
Total Kingsway Bridge Abutments and Enhancements (North Side) |
|
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
3.00 |
Low Level Bridge Access Ramps Regrading | | | | |
3.01 |
Jacking and temporary support |
|
|
|
|
3.02 |
Demolition and cut-down existing piles and crosshead |
|
|
|
|
3.03 |
Reconstruct crosshead and bridge bearing |
|
|
|
|
3.04 |
Construct shore access ramps with flood water isolation upstand walls to RL 2.20 |
|
|
|
|
3.05 |
Articulated slab between bridge deck and ramps |
|
|
|
|
| | | | |
1 180 000 |
|
Contingency |
5% | | |
59 000 |
|
Design Fees |
8% | | |
99 000 |
|
Total Low Level Bridge Access Ramps |
1 338 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
4.00 |
Queensbridge Square Works | | | | |
4.01 |
Beacon Towers |
No. |
3 |
185 000 |
555 000 |
4.02 |
Roadway reconstruction including kerbs and channels |
|
|
|
|
4.03 |
Plaza paving with bluestone bands and granite sets |
|
|
|
|
4.04 |
Landscaping, planting and trees |
| | |
|
4.05 |
Realignment of tram tracks in Queensbridge Street between river and Whiteman/Power Streets— | | | | |
|
Dual track |
m |
250 |
1 100 |
275 000 |
|
Overhead electrical |
m |
250 |
300 |
75 000 |
|
Safety zone |
Item | | |
15 000 |
|
PTC Design and Management |
| | |
|
4.06 |
Traffic signals Queensbridge Square |
| | |
|
4.09 |
Civic furniture including seats, rubbish bins, information boards and bollards |
| | |
|
4.10 |
External lighting poles |
| | |
|
| | | | |
3 210 000 |
|
Contingency |
5% | | |
161 000 |
|
Design Fees |
8% | | |
270 000 |
|
Total Queensbridge Square Works |
3 641 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
5.00 |
Queensbridge Square Tunnel Access | | | | |
|
The following works are additional to the works included in item 4 above | | |
||
5.01 |
Additional services diversions and relocations including water, gas, electricity and Telecom |
| | |
|
5.02 |
Dual lane vehicle tunnel approximately 180 metres long from Casino and exiting in South Bank Boulevard. (Tunnel constructed by cut and cover method) |
| | |
|
5.03 |
Traffic lights, tunnel exit/entry in Southbank Boulevard |
| | |
|
5.04 |
Additional roadworks to Southbank Boulevard |
| | |
|
| | | | |
3 800 000 |
|
Contingency |
5% | | |
190 000 |
|
Design Fees |
8% | | |
319 000 |
|
Total Queensbridge Square Tunnel Access |
4 309 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
6.00 |
Whiteman Street Upgrade Works | | | | |
6.01 |
Reconstruct road pavement including bluestone kerbs and channels |
|
|
|
|
6.02 |
New bluestone pedestrian paving with granite bands |
|
|
|
|
6.03 |
Bluestone and granite feature to roadway at Casino entrance |
|
|
|
|
6.04 |
Street lighting and poles |
Item | | |
35 000 |
6.05 |
Traffic signals Queensbridge Street/Power Street intersection |
| | |
|
6.06 |
Traffic signals Clarendon Street intersection |
| | |
|
6.07 |
Traffic signals basement carpark entry/exit |
| | |
|
6.08 |
Landscaping and street trees |
| | |
|
6.09 |
Civic furniture including seats, rubbish bins and information boards |
| | |
|
| | | | |
2 560 500 |
|
Contingency |
5% | | |
128 000 |
|
Design Fees |
8% | | |
215 000 |
|
Total Whiteman Street Upgrade Works |
2 904 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
7.00 |
Clarendon Street Plaza | | | | |
7.01 |
Roadway plaza paving incorporating light coloured granite bands |
|
|
|
|
7.02 |
Landscaping (including trees) |
Item | | |
25 000 |
7.03 |
Pedestrian operated traffic lights |
| | |
|
7.04 |
Civic furniture, bollards etc. |
Item | | |
10 000 |
| | | | |
450 000 |
|
Contingency |
5% | | |
23 000 |
|
Design Fees |
8% | | |
38 000 |
|
Total Clarendon Street Plaza |
511 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
8.00 |
Power Street Extension Roadworks | | | | |
8.01 |
Reconstruct road pavement including new concrete kerbs and channels |
|
|
|
|
8.02 |
New concrete pedestrian paving |
|
|
|
|
8.03 |
Overhead street lighting and poles |
| | |
|
8.04 |
Landscaping and street trees |
Item | | |
45 000 |
8.05 |
Civic furniture |
Item | | |
5 000 |
8.06 |
Traffic signals Power Street/City Road intersection |
| | |
|
| | | | |
634 000 |
|
Contingency |
5% | | |
32 000 |
|
Design Fees |
8% | | |
53 000 |
|
Total Power Street Extension Roadworks |
719 000 |
PRELIMINARY ESTIMATE—OFF-SITE EXTERNAL WORKS OPTIONS— continued
Unit |
Qty |
Rate |
Cost | ||
| | | |
$ |
$ |
9.00 |
Kingsway South Access Ramps | | | | |
9.01 |
Dual lane access ramps each side of Kingsway bridge providing access from Whiteman Street for southern access to Kingsway |
| | |
|
| | | | |
8 000 000 |
|
Contingency | | | |
incl. |
|
Design Fees | | | |
incl. |
|
Total Kingsway South Access Ramps |
8 000 000 |
EXECUTED as an agreement.
SIGNED by the Honourable |
|
HADDON STOREY |