(1) For the purposes of section 56Q, the standard applied to the relocation or rectification must result in the Utility infrastructure having the same or a similar technical capability and having at least the same remaining life as it had before it was affected.
(2) If new Utility infrastructure is required to meet the standard referred to in subsection (1), the Link corporation is liable for the cost of that new infrastructure.
S. 56S inserted by No. 81/2006 s. 72.