(1) A site owner may give a site tenant a notice to vacate a Part 4A site if the site tenant has assigned or sub-let or purported to assign or sub-let the whole or any part of the Part 4A site without the site owner's consent.
(2) The notice must specify a termination date that is not less than 14 days after the date on which the notice to vacate is given.
S. 207ZE inserted by No. 45/2018 s. 239 (as amended by No. 1/2021 s. 97).