(1) The Minister must refer a copy of an application under section 84AAI to the land manager.
(2) Within 28 days (or any longer period that the Minister allows) after receiving a copy of the application, the land manager—
(a) must consider the application; and
(b) may—
(i) advise the Minister that the land manager does not object to the variation or removal of the condition; or
(ii) advise the
Minister that the land manager objects to the variation or removal of the
condition on the
ground specified by the land manager (which must be a
reasonable ground); or
(iii) specify any variation (which must be a reasonable variation) to the condition that the land manager requires.
(3) If a land manager makes no response to the Minister within 28 days (or any longer period that the Minister allowed) after receipt of a copy of the application, the Minister may proceed to determine the application.
S. 84AAK inserted by No. 53/2014 s. 4.