Victorian Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

BUILDING REGULATIONS 2018 - REG 154

Report and consent for construction on designated land or designated works

    (1)     The report and consent of the relevant council must be obtained for an application for a building permit for the construction of a building on designated land or designated works.

    (2)     The report and consent of the relevant council under subregulation (1) may include recommendations controlling the location and construction of retaining walls and fences in relation to designated land or designated works.

    (3)     Before giving its consent under subregulation (1), the relevant council must consult with the waterway management authority for the designated land or designated works.

    (4)     The report and consent of the council need not be obtained to an application for a building permit referred to in subregulation (1) if the consent of the relevant waterway management authority has been obtained as a requirement of a planning permit for the construction of the building.

    (5)     In this regulation—

waterway management authority in relation to designated land or designated works means the Authority to which Division 2 of Part 10 of the Water Act 1989 applies that has the waterway management district (within the meaning of that Act) which contains the designated land or designated works.

Division 1—Construction in designated bushfire prone areas

Reg. 155 revoked by S.R. No. 75/2018 reg. 14.

    *     *     *     *     *



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback