Victorian Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

BUILDING REGULATIONS 2018 - REG 218

Relevant building surveyor must prepare or update maintenance schedule for an existing building or place of public entertainment

Reg. 218(1) amended by S.R. No. 180/2018 reg. 10(1).

    (1)     This regulation applies if an essential safety measure is specified in relation to a building or place of public entertainment in—

Reg. 218(1)(a) substituted by S.R. No. 180/2018 reg. 10(2).

        (a)     an occupancy permit under regulation 194; or

        (b)     a maintenance determination under regulation 215.

    (2)     The relevant building surveyor must prepare or update a maintenance schedule so that it complies with regulation 222 in relation to the building or place of public entertainment.

    (3)     The owner of a building or place of public entertainment must provide to the relevant building surveyor who must prepare or update a maintenance schedule under subregulation (2) relating to that building or place all the documents referred to in regulation 225 that relate to essential safety measures in the building or place within 7 days after a request of the relevant building surveyor to provide those documents.

Penalty:     10 penalty units.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback