Schedule 12—Information required to be included in an asbestos control plan

Regulation 272

    1     A record to indicate that the notice requirements have been met and that required documentation is kept at the workplace where the asbestos removal work is performed.

    2     In relation to asbestos—

        (a)     its location; and

        (b)     the quantity of asbestos proposed to be removed; and

        (c)     in relation to asbestos-containing material—

              (i)     whether the asbestos-containing material is friable or non-friable; and

              (ii)     the type of asbestos-containing material; and

              (iii)     the condition of the asbestos-containing material.

    3     The type of personal protective clothing and personal protective equipment to be used, including respiratory protective equipment.

    4     Proposed risk control measures to be used to prevent release of airborne asbestos fibres from the area where the asbestos removal work is being performed.

    5     If the area where the asbestos removal work is being performed in a negative air enclosure, details regarding—

        (a)     smoke testing; and

        (b)     negative air units.

    6     Details of decontamination procedures for—

        (a)     persons performing the asbestos removal work; and

        (b)     tools and equipment used for the asbestos removal work; and

        (c)     non-disposable personal protective clothing and personal protective equipment.

    7     Method of disposal of—

        (a)     asbestos waste; and

        (b)     disposable personal protective clothing and personal protective equipment; and

        (c)     the structure used to enclose the area where the asbestos removal work is being performed.

    8     Administrative controls to be implemented, including—

        (a)     security; and

        (b)     work practices.

    9     Methods of cleaning following asbestos removal work.

    10     Names of persons engaged by the licence holder or person who commissioned the asbestos removal work (as applicable) to conduct asbestos paraoccupational air monitoring (if any) and to conduct the clearance inspection.

    11     Names of any independent contractors engaged by the asbestos removal licence holder to perform asbestos removal work.