Victorian Numbered Acts

[Index] [Table] [Search] [Search this Act] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

YARRA RIVER PROTECTION (WILIP-GIN BIRRARUNG MURRON) ACT 2017 (NO. 49 OF 2017) - SECT 24

Public submissions on draft Yarra Strategic Plan

    (1)     The lead agency must advertise, in any manner the lead agency thinks fit—

        (a)     the availability of a draft Yarra Strategic Plan for inspection; and

        (b)     the opportunity for public submissions to be made to the lead agency on the draft plan, indicating that all submissions will be available for inspection by the public; and

        (c)     the time period for public submissions to be made, being a period of at least 2 months.

    (2)     The lead agency must make a copy of all public submissions on a draft Yarra Strategic Plan made to the lead agency available for public inspection, free of charge, at the agency's office.

    (3)     At the end of the public submission period, the lead agency must—

        (a)     consider all submissions made to the lead agency; and

        (b)     refer any submissions in relation to the land use framework plan that the lead agency does not fully adopt to a panel appointed under section 25 to conduct a hearing.

Subdivision 3—Panels and public hearings



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback