(1) The construction of any one or more of the following is a high impact activity if the construction would result in significant ground disturbance—
(a) an airfield;
(b) a bicycle track;
(c) a helipad;
(d) rail infrastructure;
(e) a road;
(f) a walking track in a park;
(g) a telecommunications line consisting of an underground cable or duct with a length exceeding 500 metres.
(2) In this regulation, telecommunications line has the same meaning as in the VPP.