Victorian Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

VICTORIAN ENERGY EFFICIENCY TARGET REGULATIONS 2008 (SR NO 158 OF 2008) - SCHEDULE 1

SCHEDULE 1

Sch. 1

Regulation 6(a)

WATER HEATER

Prescribed activity under regulation 6(a):     Decommissioning an electric resistance water heater and installing a product that complies with the criteria specified in Part A of Schedule 1 .

PART A—CRITERIA

Item

    1A     Gas or liquefied petroleum gas storage water heater certified by an accredited body as achieving a minimum 5 star rating when tested and rated in accordance with AS 4552/AG102—2000 or AS 4552—2005 and listed in the ESC register.

    1B     Gas or liquefied petroleum gas instantaneous water heater certified by an accredited body as achieving a minimum 5 star rating when tested and rated in accordance with AS 4552/AG102—2000 or AS 4552—2005 and listed in the ESC register.

    1C     Electric boosted solar or heat pump water heater certified by an accredited body to AS/NZS 2712:2007, achieving a minimum energy performance of 60% solar contribution in zone 4 (Melbourne) climate as determined in accordance with AS 4234—1994 and listed in the ESC register.

    1D     Gas or liquefied petroleum gas boosted solar water heater certified by an accredited body to AS/NZS 2712:2007, achieving a minimum energy performance of 60% solar contribution in zone 4 (Melbourne) climate as determined in accordance with AS 4234—1994 and listed in the ESC register.

PART B—CALCULATION OF CARBON DIOXIDE EQUIVALENTS OF GREENHOUSE GASES

Sch. 1

The method and variables to be used to calculate in tonnes the carbon dioxide equivalent of greenhouse gases to be reduced by the decommissioning of an electric resistance water heater, and the installation of a product referred to in an item in Part A is determined by multiplying the abatement factor for that item by the regional factor (if any) applying to the place where the product is installed.

The following are the abatement factors and regional factors for each item in Part A:

Item

    1A     Abatement factor:

        (a)     If the product has a storage capacity less than 95 litres:     18·0

        (b)     If the product has a storage capacity of
95 litres or more but not more than 140 litres:     32·8

        (c)     If the product has a storage capacity of more
than 140 litres:     43·0

    1B     Abatement factor:

        (a)     If the product has a water heating capacity
(L/min) @ 25°C rise of less than 18 L/min:     19·7

        (b)     If the product has a water heating capacity
(L/min) @ 25°C rise of 18 L/min or more
but not more than 22 L/min:     33·7

        (c)     If the product has a water heating capacity
(L/min) @ 25°C rise of more than 22 L/min:     43·1

    1C     Abatement factor:

        (a)         If the product is a small system as determined in accordance with AS 4234—1994 based on the system's peak daily thermal energy load delivery characteristics and—

              (i)         is installed in metropolitan Victoria:     08-158sr01.jpg ;

              (ii)     is installed in regional Victoria:     08-158sr02.jpg;

        (b)     If the product is a large system as determined in accordance with AS 4234—1994 based on the system's peak daily thermal energy load delivery characteristics and—

              (i)     is installed in metropolitan Victoria: 08-158sr03.jpg;

              (ii)     is installed in regional Victoria: 08-158sr04.jpg.

    1D     Abatement factor:
Sch. 1

        (a)     If the product is a small system as determined in accordance with AS 4234—1994 based on the system's peak daily thermal energy load delivery characteristics and—

              (i)         is installed in metropolitan Victoria:     08-158sr05.jpg ;

              (ii)     is installed in regional Victoria: 08-158sr06.jpg;

        (b)     If the product is a large system as determined in accordance with AS 4234—1994 based on the system's peak daily thermal energy load delivery characteristics and—
Sch. 1

              (i)     is installed in metropolitan Victoria: 08-158sr07.jpg ;

              (ii)     is installed in regional Victoria: 08-158sr08.jpg .

    1A–1B                 Regional factor:

        (a)     If the product is installed in metropolitan
Victoria:     0·97;

        (b)     If the product is installed in regional
Victoria:     1·05.

1C–1D Regional factor:     1.

PART C—TIME AT WHICH ACTIVITY UNDERTAKEN

Item

    1A     At the beginning of the day which is the later of the day on which the installed product is first able to produce and deliver water heated by gas or liquefied petroleum petroleum gas and the day on which the electric resistance water heater is decommissioned.

    1B     At the beginning of the day which is the later of the day on which the installed product is first able to produce and deliver water heated by gas or liquefied petroleum gas and the day on which the electric resistance water heater is decommissioned.

    1C     At the beginning of the day which is the later of the day on which the installed product is first able to produce and deliver water heated by solar energy and the day on which the electric resistance water heater is decommissioned.

    1D     At the beginning of the day which is the later of the day on which the installed product is first able to produce and deliver water heated by solar energy and the day on which the electric resistance water heater is decommissioned.
Sch. 1

__________________



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback