(1) In this Part and
in Schedules 5 and 6 —
electricity distribution capacity , in relation to
the electricity distribution system operated by a corporation, means, subject
to any provision made by the regulations, the capacity of the system to
transport electricity from or to a particular point, consistent with the need
to maintain the continuity and integrity of that system, whether or not that
capacity is committed to existing users;
electricity distribution system , in relation to a
corporation, means —
(a) the
part or parts of the system operated by the corporation for the transportation
of electricity that is or are prescribed by the regulations for the purposes
of this paragraph; and
(b)
plant and equipment that is —
(i)
used by the corporation —
(I) in connection with the transfer of
electricity to or from any part referred to in paragraph (a); or
(II) for a purpose
related to such transfer;
and
(ii)
prescribed, or of a kind that is prescribed, by the
regulations for the purposes of this subparagraph;
electricity transmission capacity , in relation to
the electricity transmission system operated by a corporation, means the
capacity of the system to transport electricity, consistent with the need to
maintain the continuity and integrity of that system;
electricity transmission system , in relation to a
corporation, means —
(a) the
part or parts of the system operated by the corporation for the transportation
of electricity that is or are prescribed by the regulations for the purposes
of this paragraph; and
(b)
plant and equipment that is —
(i)
used by the corporation —
(I) in connection with the transfer of
electricity to or from any part referred to in paragraph (a); or
(II) for a purpose
related to such transfer;
and
(ii)
prescribed, or of a kind that is prescribed, by the
regulations for the purposes of this subparagraph;
regulations means the regulations referred to in
section 95.
(2) In this Part user
, in relation to a corporation, means a person who has an arrangement with the
corporation for access to either or both of electricity transmission capacity
and electricity distribution capacity, and includes the corporation to the
extent that it has access to either or both of electricity transmission
capacity and electricity distribution capacity.
(3) In this Part a
reference to Schedule 5 or 6 is a reference to that Schedule as in force
before its repeal by the Electricity Transmission and Distribution Systems
(Repeal and Related Provisions) Regulations 2007.
[Section 89 amended: No. 53 of 2003 s. 107; No. 18
of 2005 s. 139; amended in Gazette 26 Jun 2007 p. 3019.]
[ 90, 91. Deleted in Gazette 26 Jun 2007 p. 3019.]
[ 92, 93. Deleted: No. 18 of 2005 s. 139.]