(1) An approval shall
be subject to a condition that the construction or installation to which the
approval relates is completed prior to the expiration of —
(a) a
period of 2 years; or
(b) any
lesser period specified in the approval.
(2) Where —
(a) an
approval is granted for the construction or installation of an apparatus; and
(b) the
construction or installation is commenced but is not completed within the
period referred to in subregulation (1); and
(c) a
fresh approval to continue the construction or installation has not been
granted,
the owner of the
premises on which the apparatus was being constructed or installed shall, as
soon as practicable after the expiration of that period, ensure that the
apparatus is decommissioned in accordance with regulation 21.
[Regulation 6 inserted: Gazette
29 Jul 1997 p. 4070‑1.]