NATIONAL THIRD PARTY ACCESS CODE FOR NATURAL GAS PIPELINE SYSTEMS - REG 2.2

2.2

                If a Pipeline is Covered, the Service Provider must submit a proposed Access Arrangement together with the applicable Access Arrangement Information for the Covered Pipeline to the Relevant Regulator:

            (a)         within 90 days after the Pipeline becomes Covered under section 1.19 or 1.21 if the Covered Pipeline is not described in Schedule A; or

            (b)         within 90 days after the commencement of the Code if the Covered Pipeline is described in Schedule A.