The Arbitrator must
provide a final decision under section 6.7 within three months of requiring
parties to make submissions under section 6.4. The Arbitrator must also ensure
that there is a period of at least 14 days:
(a)
between requiring parties to make submissions under section 6.4 and the last
day for such submissions specified by the Arbitrator; and
(b)
between providing a draft decision to the parties under section 6.9(b) and the
last day for submissions on the draft decision specified by the Arbitrator.
In all other respects
the timing for the taking of each of the steps set out in section 6.9 is a
matter for the Arbitrator to determine.