68 .         Inspection of plumbing work by officer, notice of etc.

        (1)         The Board may give notice of inspection to a licensed plumbing contractor or permit holder in respect of plumbing work —

            (a)         for which the contractor or permit holder is responsible; or

            (b)         for which the contractor or permit holder has given, or is required to give, a certificate of compliance,

                specifying —

            (c)         the plumbing that is to be inspected by a plumbing compliance officer; and

            (d)         what test or tests (if any) are to be carried out; and

            (e)         the time within which the inspection must take place (which must be at least 2 working days after the day on which notice is received).

        (2)         Notice under subregulation (1) may be oral.

        (3)         If the plumbing to be inspected is at a dwelling, the contractor or permit holder is, to the extent possible, to —

            (a)         arrange a time for the inspection with the occupier (or owner if there is no occupier) of the dwelling; and

            (b)         obtain the written consent of the occupier (or owner if there is no occupier) to the plumbing compliance officer, and any other necessary persons, entering the dwelling for the purposes of the inspection; and

            (c)         give the written consent to the plumbing compliance officer.

        (4)         The recipient of a notice under subregulation (1) must —

            (a)         provide, or arrange for the provision of, the equipment, material, power and labour necessary for the test or tests (if any); and

            (b)         ensure that the recipient or a licensee or permit holder whose licence or permit covers the type of work to be inspected is present at the time of the inspection.

        (5)         The Board is not to give notice of inspection to a licensed plumbing contractor or permit holder in respect of plumbing work more than 6 years after the work is completed (which, if no rectification notice in respect of the work has been given, is to be taken to be the time when the certificate of compliance for the work is given).

        [Regulation 68 inserted: Gazette 28 Jun 2004 p. 2433‑5; amended: Gazette 7 Oct 2005 p. 4522‑3.]