Western Australian Current Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

PETROLEUM (SUBMERGED LANDS) (RESOURCE MANAGEMENT AND ADMINISTRATION) REGULATIONS 2015 - SCHEDULE 13

[r. 76(1)]

Item

Description of information

1.

The name of the survey.

2.

The title, authority or consent under which the survey is being conducted.

3.

The name of the instrument holder.

4.

The dates on which processing of the survey started and ended.

5.

The name of the processing contractor.

6.

The purpose of the processing.

7.

A summary of the data acquisition parameters.

8.

Details of all processing sequences and techniques used.

9.

A sample Extended Binary Coded Decimal Interchange Code (EBCDIC) header from the final data set.

10.

Listings of all processed data.

11.

For a 3‑dimensional survey —

(a)         a description of the position of the survey polygon; and

(b)         a calculation for the 3‑dimensional line numbering convention.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback