Western Australian Current Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

PETROLEUM (SUBMERGED LANDS) (RESOURCE MANAGEMENT AND ADMINISTRATION) REGULATIONS 2015 - SCHEDULE 6

[r. 72(1)]

Item

Description of information

1.

The name and number of the well.

2.

The name of the instrument holder.

3.

The name of the instrument area in which the well is located.

4.

The purpose of the well activity (for example, testing or intervention).

5.

The status of the well (for example, producing, suspended or decommissioned).

6.

The location of the well, in the form of —

(a)         the elevation, latitude and longitude of the well; and

(b)         the basin and sub‑basin (if applicable) in which the well is located; and

(c)         the map sheet name and graticular block number.

7.

The start date of the well activity.

8.

The end date of the well activity.

9.

What is being used as the depth reference for the well (for example, the Kelly bushing or the rig floor).

10.

The height of the depth reference above sea level or the Australian Height Datum.

11.

The water depth or ground depth at the well.

12.

The measured depth of the well.

13.

The true vertical depth of the well.

14.

If applicable, the depth of perforation in the petroleum pool.

15.

If applicable, the name of the drilling contractor.

16.

If applicable, the name of the rig drilling the well.

17.

If applicable, the rig’s make and model.

18.

If applicable, a list of log runs for wireline logging and velocity surveys.

19.

If applicable, the names of the contractors for —

(a)         cementing; and

(b)         wireline logging; and

(c)         measurements while drilling (MWD); and

(d)         logging while drilling (LWD); and

(e)         mudlogging.

20.

If applicable, the names of MWD and LWD tools used.

21.

Details of equipment and casing installed on or in the well, including schematics.

22.

If applicable, information on cementing operations and schematics of decommissioning.

23.

Treatment materials used.

24.

Treatment material losses.

25.

If applicable, wireline formation analysis and processing results.

26.

If applicable, production test results.

27.

Details of any indication of petroleum.

28.

Raw pressure‑time listings for any formation fluid sample tests and production tests.

29.

Details of any produced formation materials.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback