(1) Before any pumping
operations of inflammable liquids are commenced, and during the continuance of
those operations, the master shall cause —
(a) a
competent signalling staff to be in attendance both at the tank installation
and on board the oil vessel; and
(b)
telephonic communication between the same points to be established and
maintained.
(2) A responsible
person shall be detailed by the master for attendance on the wharf or jetty to
superintend the opening and closing of valves and for patrol of the pipe line
during the whole of the pumping operation, and pumping operations shall not be
commenced before the correct position of all valves has been verified by the
harbour master, and the harbour master is satisfied that all precautions
necessary have and will be taken to prevent leakages.
[Regulation 39 amended: Gazette
4 Jun 2010 p. 2464‑5.]