[r. 12]
[Heading inserted: SL 2024/117 r. 9.]
[Heading inserted: SL 2024/117 r. 9.]
1. Service charges for 2024/25 and subsequent
years
The charges set out in
this Division apply for water supply services provided in the 2024/25
financial year and each subsequent year.
For a residential lot,
the charge is $240.35
For a
non‑residential lot, the charge, according to the size of the meter,
is —
20 mm $257.38
25 mm $402.12
40 mm $1 029.46
50 mm $1 608.52
80 mm $4 117.84
100 mm $6 434.10
150 mm $14 476.69
For vacant land, the
charge is $248.19
For a fire service
connection, the charge is $257.38
[Division 1 inserted: SL 2024/117
r. 9.]
Division 2 — Consumption charges
[Heading inserted: SL 2024/117 r. 9.]
6. Consumption charges for 2024/25 and subsequent
years
The charges set out in
this Division apply for water supplied in the 2024/25 financial year and
each subsequent year.
(1) For each kilolitre
of water supplied to a residential lot, the charge is —
up to 150 kL $1.20
over 150 but not over 350 kL
$1.67
over 350 but not over 500 kL
$1.91
over 500 but not over 700 kL
$2.52
over 700 but not over 1 000 kL
$3.53
over 1 000 kL
$3.62
(2) The volumetric
ranges in this item have effect by reference to the volume of water supplied
in the current consumption year.
For each kilolitre of
water supplied to a
non‑residential lot, the charge is
$2.03
9. Water supply service (fire)
For each kilolitre of
water supplied through a
fire service connection, the charge is
$2.49
[Division 2 inserted: SL 2024/117
r. 9.]