This legislation has been repealed.
(1) When an oil vessel
at a wharf or jetty has completed discharging inflammable liquid in bulk the
connection or connections to the shore pipe line shall not be broken until the
pipe line for its whole length has been completely and satisfactorily, to the
Station Master and the Harbour Master, cleared of all inflammable liquid.
(2) Immediately
discharge of the inflammable liquid is suspended or completed all lids, screw
caps or other coverings shall be replaced, securely fastened down and made gas
tight.